Pastatas jums bus perduotas su daline apdaila į kurią įeina:
- Walls:
- Exterior walls made of three-layer reinforced concrete wall panels
- Interior retaining walls made of single-layer reinforced concrete wall panels
- Partitions: 125mm plasterboard (metal stud framing, 12.5 mm plasterboard, acoustic insulation in partitions)
- Partial interior fit-out::
- Gypsum plastered walls
- Concrete subfloor
- Roof:
- Expanded polystyrene thermal insulation
- Waterproofing layer made of PVC roofing membrane
- Windows:
- REHAU profile
- Profile material – PVC
- Facade – decorative plaster
- Landscaping:
- Paving (200x100x60 mm paving blocks, 1000х80х200 mm edging)
- Lawn (grass)
- Heating system:
- Polyethylene piping installed (Ø 16 mm)
- Electric boiler
- Stainless steel distribution manifold for six circuits with flow meters
- Ventilation system:
- Ducts
- Recuperator
- Mechanical check valve
- Internal power grid:
- Electric cables installed (BVV-P 3×1,15, BVV-P 3×2,5, BVV-P 3×4)
- Electricity meter installed
- External power grid: VVGng 5×4 cable, inlet into the house through a corrugated PVC pipe
- External power grid: VVGng 5×4 cable, inlet into the house through a corrugated PVC pipe
- Internal water supply:
- Water meter installed
- Ø20 polypropylene pipes installed to the equipment
- External water supply: PE PN 10 Ø32 pipe, inlet into the house through a corrugated PVC pipe
- Internal sewerage: Ø50 PVC pipes installed to the equipment locations
- External sewage: Inlet from a Ø110 PVC pipe, Ø425 mm PVC cleaning/inspection chambers, inlet into the house through a corrugated PVC pipe
- Rainwater: Ø110 PVC pipes installed, Ø2000 mm reinforced concrete well